1970 Office Tower

Property details
  • Developer
    Developer Al Habtoor Group
  • Delivery date
    Delivery date Q1 2029
  • Payment plan
    Payment plan 60/40
  • Property type
    Property type Offices
  • Area
    Area 1 , 884 – 2 , 393 SQFT
Amenities
  • Community Hall
    Community Hall
  • Retail Outlets
    Retail Outlets
  • Separate Terraces for BBQ and Dining
    Separate Terraces for BBQ and Dining
  • Smart Community Features
    Smart Community Features
  • 24-7 Concierge
    24-7 Concierge
About property

1970 Office Tower by Al Habtoor Group is a landmark Grade A commercial development located within Al Habtoor City, Dubai, along the prestigious Sheikh Zayed Road and Dubai Water Canal corridor. Rising approximately 289 metres, the tower is designed to create a premium corporate address for businesses, entrepreneurs, and investors seeking high-quality office space in the heart of Dubai.

The development features 50 dedicated office floors, with only eight offices per typical floor, creating a more private and exclusive working environment. Office spaces range from approximately 1,884 to 2,393 sq. ft., featuring floor-to-ceiling glazing, flexible layouts, abundant natural light, and panoramic views across Dubai’s skyline.

Architecturally, 1970 Office Tower is distinguished by its stacked glass volumes, landscaped sky gardens and terraces, creating outdoor breakout spaces throughout the building. A grand corporate lobby, retail areas, business lounges, dedicated amenity floors, extensive parking, smart building systems, and premium arrival areas complete the business-focused environment.

Its strategic position within Al Habtoor City provides direct access to Sheikh Zayed Road while placing businesses close to Business Bay, Downtown Dubai, DIFC, Dubai World Trade Centre, and Dubai International Airport. Combining a prestigious address, low-density office floors, modern architecture, and strong connectivity, 1970 Office Tower presents an attractive opportunity for corporate occupiers and commercial property investors.

Connectivity & Location

1970 Office Tower is strategically located within Al Habtoor City, providing direct connectivity to Sheikh Zayed Road and Dubai’s major commercial districts.

The tower is close to:

  • Business Bay
  • Downtown Dubai
  • Burj Khalifa & Dubai Mall
  • DIFC
  • Dubai World Trade Centre
  • Dubai Water Canal
  • Dubai International Airport
  • Sheikh Zayed Road

Its central location allows companies to operate close to Dubai’s primary financial, commercial, hospitality, and lifestyle destinations.

Map
  • Address
    Mazaya Centre - Sheikh Zayed Collector Rd - Al Wasl - Dubai - United Arab Emirates
  • Location
    Business Bay
  • City
    Dubai

See also

The Christian A. Rockefeller Business Tower
4.31M AED
Palace Residences Hillside B
1.96M AED

Palace Residences Hillside B

Dubai Hills Estate
Emaar Properties

Delivery date: Q4 2029

Berkeley Tower by Ellington
5.63M AED

Berkeley Tower by Ellington

Business Bay
Ellington Properties

Delivery date: Update Soon

Binghatti Cullinan
1.4M AED

Binghatti Cullinan

Al Jaddaf
Binghatti

Delivery date: Q2 2027

The Bay Interiors by Missoni
2.68M AED

The Bay Interiors by Missoni

Dubai islands
Tomorrow World Group

Delivery date: Q3 2029

Flora Isle
2M AED

Flora Isle

Dubai islands
Centurion Properties

Delivery date: Q1 2028

Alva at The Valley
4.3M AED

Alva at The Valley

The Valley
Emaar Properties

Delivery date: Q4 2030

Binghatti Starfall
750K AED

Binghatti Starfall

Al Jaddaf
Binghatti

Delivery date: Q2 2028

Mi Casa
750K AED

Mi Casa

Jumeirah Village Circle
London Gate

Delivery date: Q4 2027

Capital One
1.52M AED

Capital One

Motor City Dubai
Centurion Properties

Delivery date: Q1 2027

Sola Residences
1.2M AED

Sola Residences

Jebel Ali District
Centurion Properties

Delivery date: Q4 2027

Golf Trails
1.25M AED

Golf Trails

Dubai South
Emaar Properties

Delivery date: Q4 2030

Binghatti Spectre
775K AED

Binghatti Spectre

Al Jaddaf
Binghatti

Delivery date: Q4 2028

1970 Office Tower
9.4M AED

1970 Office Tower

Business Bay
Al Habtoor Group

Delivery date: Q1 2029

Everly Place
1.9M AED

Everly Place

MBR City Dubai
Ellington Properties

Delivery date: Q4 2030

KAIA
1.72M AED

KAIA

Dubai islands
Amwaj Development

Delivery date: Q4 2028

Cheval Residences
2.8M AED

Cheval Residences

Dubai islands
Cheval Collection

Delivery date: Q1 2029

Sakura Gardens
860K AED

Sakura Gardens

Dubailand
HRE Development

Delivery date: Q1 2029

Valia Tower
2.06M AED

Valia Tower

Dubai Creek Harbour
Emaar Properties

Delivery date: Q3 2030

SAMANA Business Hub
1.46M AED

SAMANA Business Hub

Jebel Ali District
SAMANA Developers

Delivery date: Q2 2029

O1NE DISTRICT
5M AED

O1NE DISTRICT

Motor City Dubai
AVENEW Development

Delivery date: Q1 2030

Richmond District
890K AED

Richmond District

Al Furjan
Mira developments

Delivery date: Q1 2029

Sky Level 1
945K AED

Sky Level 1

Jumeirah Village Circle
Object 1

Delivery date: Q2 2029

Golf Fields
1.26M AED

Golf Fields

Dubai South
Emaar Properties

Delivery date: Q1 2030

Oxford Cove
1.67M AED

Oxford Cove

Jumeirah Village Circle
IMAN

Delivery date: Q1 2029

Greenz by Danube
3.5M AED

Greenz by Danube

Dubai Academic City
Danube Properties

Delivery date: Q4 2029

Raw District by Imtiaz
649K AED

Raw District by Imtiaz

Jebel Ali District
Imtiaz Developments

Delivery date: Q1 2029

Arancia Yards by BEYOND
1M AED

Arancia Yards by BEYOND

Dubailand
Beyond

Delivery date: Q4 2028

Tilal Binghatti Dubai
4.2M AED

Tilal Binghatti Dubai

Dubai Academic City
Binghatti

Delivery date: Q2 2028

Binghatti Wraith
799K AED

Binghatti Wraith

Al Jaddaf
Binghatti

Delivery date: Q4 2027

Azizi Jaddaf Beach Oasis
720K AED

Azizi Jaddaf Beach Oasis

Al Jaddaf
Azizi Developments

Delivery date: Q4 2028

Meriva Collection at Dubai Islands
2.7M AED

Meriva Collection at Dubai Islands

Dubai islands
Ellington Properties

Delivery date: Q1 2030

Serenz by Danube
1.1M AED

Serenz by Danube

Jumeirah Village Circle
Danube Properties

Delivery date: 2029

Fior at Rashid Yachts & Marina
2.2M AED

Fior at Rashid Yachts & Marina

Rashid Yachts & Marina
Emaar Properties

Delivery date: Q3 2030

Seacliff by Imtiaz
2M AED

Seacliff by Imtiaz

Dubai islands
Imtiaz Developments

Delivery date: Q1 2028

Golf Vale at Emaar South
1.1M AED

Golf Vale at Emaar South

Dubai South
Emaar Properties

Delivery date: Q1 2030

Artistry Two Residences
2.3M AED

Artistry Two Residences

Dubai Design District (d3)
Select Group

Delivery date: Q1 2029

Artistry One Residences
2.21M AED

Artistry One Residences

Dubai Design District (d3)
Select Group

Delivery date: Q4 2029

Binghatti Skyflame in Majan
555K AED

Binghatti Skyflame in Majan

Majan
Binghatti

Delivery date: Update Soon

Contact us